Bomb Tramway

Function

The charges are transported from out the station with manual or electric drive, transported to the avalanche starting zone and then detonated over the snow cover.
By using a charge carrier, up to 4 charges can be carried and dropped in one run by means of remote radio control.

Advantages

Previous
Next